Project Management

Serving customers in every phase starting from engineering to commissioning of hydraulic systems.

Project stages Associated Departments
The agreement and technical specification are mutually signed. Project
The production schedule and planning table are submitted to the customer and the customer’s approval is received. Project and Production Planning
The schematics and bill of materials are submitted to the customer and the customer’s approval is received. Project
The process of purchase for the materials to be used in the system is commenced and monitored. Project and Purchase
3D solid model system designs and assembly drawings are submitted to the customer and the customer’s approval is received. Project and Design
The manufacturing processes are executed in accordance with the technical specification and in line with the quality standards. The required interim tests are performed. Quality
Functional, pressure and leakage tests are performed after welding, assembly and paint. Test reports are issued. Hydraulic test, Quality
The assembly, cabling and testing of the electrical terminal box are performed. Test reports are issued. Electrical test, Quality
The final inspection and tests are performed by the customer. Inspection report and release for shipment document is issued and mutually signed. Project
The preparations with respect to export, packaging and shipment are performed as specified in the agreement, submitted to the customer and the customer’s approval is received. Sales support
Spare parts list in accordance with the requirements of the end user is offered, price proposal is submitted. After shipment, the as built documents folder is drawn up and submitted to the customer. Project
The documentation includes the hydraulic schematics, bill of materials, assembly drawings, manuals, product datasheets, test reports, certificates, electrical wiring diagrams and photograph files. Project, Design and Quality
Hydraulic piping, pickling and flushing applications are carried out on-site in line with the customer’s request. Hydraulic technicians
System controls and commissioning is performed. Hydraulic technicians / Service team
Basic training is provided for the technical maintenance personnel. Hydraulic technicans / Service team